Tutorials & Review

How To Build 3 Bedroom Flat Bungalow House With #1.4 Million

To build a house with small amount of money, it can work but it depends on your taste of choices and the type of bedroom you want to demand for.

But firstly ask yourself is it a bedroom that is Complex or Lesser, if it is Complex that will cost you more money and a person having small amount of money will not be able to afford that. But if it is lesser; Ask your is it a bedroom flat with toilets and bathrooms for each each room. Again do you intend to use tiles or with neat flooring for bathroom and kitchen?

Don’t Panic: THESE ARE WAY YOU CAN BUILD YOUR HOUSE (BEDROOM FLAT) WITH SMALL AMOUNT OF MONEY:

As Land required (it can be a plot or half of a plot), as you want to build it in a small quantity, just find a land with not less than #80,000-#120,000.

You can use #1.4 million to build 3 bedroom flat just in a manageable way:

Since, you’ve find a land, just hire for expert/professional bricklayer/engineer that will understand your situation. As far as you’ve already get a land, there is nothing require much than to start house processing. But note the house will not be fence for that moment

Choose House plan how it will looks like:

These are the house materials/estimations

You need:

1. Sands

2. Blocks


TO WATCH THE VIDEO TAP HERE AND CLICK "GET STARTED"

3. Cements

4. Wood Planks

5. Rods

The average cost for each block = #200

The average cost of a cement = #2500

FOR 3 BEDROOM FLAT:

2650 blocks needed and atleast 180 bags of cements also needed too:

BLOCK: 1 block = #200

2650 blocks = #530,000

CEMENT: 1 Cement = #2500

180 bags of cement = #450,000, and you have #1.4 million almost #980,000 has been demanded for blocks & cements.

So therefore: #1.4 million – #980,000 = #420,000 remained.

From that #420,000, Labour and roofing money should also be deduct. You can budget atleast #100,000-#120,000 or less than thatfor labour money but it depends on the number of labourer used. The remaining money should be used for roofing, partially flooring and soakaway. But all you need to do is to find the related workers that will understand your concept analysis.

The House can also be improve when you later have more money but you will witness how #1.4 million will get you too.

Note: The advantages and disadvantages of buying block from block industries and moulding it by yourself

FOR INDUSTRY

1. If you buy block from industry, there is no wasting of time on your house construction, everything will be consumed timely.

2. Industries block may not stronger than the one you mould by yourself because industries can use a bag of cement to mould 40-45 blocks this will less in weight and may not strong enough.

FOR MOULDING:

1. There is wasting of time

2. It can generate alot of money more than you budget before

3. It will be stronger than that of industries block. But mind you don’t mould in raining season to avoid collapse.

Do you like Fabpulse? We count on you! Follow us on Googlenews, And get 1k. Click Here, and Click the Star. Thank you!
Also Follow us on Facbook, Twitter, Instagram For Give Away!
JOIN OUR WHATSAPP GROUP FOR LATEST NEWS UPDATES 247🔥 (CLICK HERE)
Follow Us On Twitter For Free Give Away Daily (CLICK HERE)
Join Our Facebook Group & Get Unlimited Likes On Your Post (CLICK HERE)

Dominic Nwodo

One Of The Best Content Creator/Blogger In Nigeria. 👉DM Me For Business 08109211747

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button